The project consisted of three separate areas:
Area 1
office renovation
Area 2
R&D test cell build-out
Area 3
fitness Center build-out
The project presented schedule challenges as the office renovation had to be complete by November, enabling Kawasaki to move out of their temporary office space on time.
The R&D test cell fit-out ran concurrently with the office renovations with completion timelines of the main MEP systems to allow for R&D equipment install and commissioning to bring equipment on-line for Kawasaki.
There were (2) separate equipment moves from their existing facility in Maryville, Missouri to Grand Rapids. Test cells had to be made ready in advance to receive the equipment. The project also included a fuel delivery system that feeds each of the test cells, as well, an interior fuel dispensing room was constructed to allow Kawasaki the ability to fuel equipment inside the building from a fuel pump. The fuel delivery/dispensing system helps to keep Kawasaki more efficient during their testing procedures.
previous Project
previous Project