toggle menu
Case Study
Case Study
Case Study

Whirlpool Corporation

Benton Harbor Tech Center

Whirlpool Corporation's Benton Harbor Tech Center Phase II project was inclusive of roughly 60,000 sq. ft. of renovations to a previous manufacturing facility. As part of the renovations, Rockford managed the construction of a new underfloor HVAC air distribution system. Due to the heights inside the facility of nearly 30', utilizing the underfloor system allowed for better opportunities to direct/focus the air flow at the employees where they sit versus pushing air down into the space.

 

Dan Bailey

Vice President of Industrial

616.432.6455